Kemper Case Studies


New and improved stacker case study cover

New and Improved Stacker in Just 4 Days

Just another day of exemplary service by 万博客户端2.0版本.


case study graphic

Discharge & Chute Wear
Rubber Ceramic Liners vs. Metal Liners

case study graphic

Choosing the Right Portable Plant Makes the Difference for 8s and Spec Sand

case study graphic

Conveyor Systems vs. Truck Hauling

Many times, moving product with a conveyor system is more economical than using rolling stock and truck driving labor. Plus, they can have less environmental impact in protected areas.

case study graphic

Clean Product Doubles Production

Customer wanted to sort/clean loads of process run quarry rocks witha 992 loader

case study graphic

Cost Effective Wash Plant

Portability of Wash Plant Provides Cost Effective Solution for 250 tph Trap Rock Operation

chute design/build case study

Chute Design/Build


Custom hood and spoon chute minimize material breakdown.


decrease fines case study

Decrease Fines


Kemper manufactured chute decreased -30mm waste from 11% to 3%


Increase sand production case study

Increased Sand Production


Kemper was able to help a sand producer with the solution and equipment they needed.


Scales Improve Accuracy case study

Scales Improve Accuracy of 1800-2200 TPH Railcar Loadout